MURRAY ROAD (NBL) over HAWKS GULLY

13.3 MI NE OF HEPHZIBAH · County 245, Georgia · Built 1990 · 2 Lanes · 13,600 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000024501190
Year Built
1990
Length
87.2 m (286.1 ft)
Max Span
21.9 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
13,600
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,117,000
Total Project Cost
$1,676,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.