CR 31 UNION CHU over PATAULA CREEK

1.5 MI NW OF SPRINGVALE · County 243, Georgia · Built 1972 · 2 Lanes · 350 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000024350090
Year Built
1972
Reconstructed
2002
Length
121.9 m (399.9 ft)
Max Span
6.1 m
Width
7.7 m (25.3 ft)
Lanes
2
Daily Traffic
350
Material
Prestressed Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,563,000
Total Project Cost
$2,344,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.