US 82/SR 50 over PATAULA CREEK

2 MILES NORTHWEST OF MORR · County 239, Georgia · Built 1993 · 2 Lanes · 1,870 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000023900100
Year Built
1993
Length
195.1 m (640.1 ft)
Max Span
12.2 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
1,870
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,501,000
Total Project Cost
$3,751,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.