UNION CHURCH ROAD over PATAULA CREEK

2.59 MILES NOTH OF MORRIS · County 239, Georgia · Built 2012 · 2 Lanes · 20 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000023950130
Year Built
2012
Length
107.3 m (352 ft)
Max Span
38.4 m
Width
9.6 m (31.5 ft)
Lanes
2
Daily Traffic
20
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,375,000
Total Project Cost
$2,063,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.