WHITE ROAD over I-75

0.5 MI SE OF BYRON · County 225, Georgia · Built 1963 · 2 Lanes · 7,580 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000022500160
Year Built
1963
Length
72.5 m (237.9 ft)
Max Span
24.4 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
7,580
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$930,000
Total Project Cost
$1,395,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.