SR 49 over I-75 (EXIT 149) @ 149.39

BRYON CITY LIMITS · County 225, Georgia · Built 1963 · 5 Lanes · 19,890 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000022500060
Year Built
1963
Reconstructed
1988
Length
77.1 m (253 ft)
Max Span
26.2 m
Width
24.5 m (80.4 ft)
Lanes
5
Daily Traffic
19,890
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,797,000
Total Project Cost
$2,696,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.