S MAIN ST over WEAVER CREEK

0.6 MI NE OF DALLAS · County 223, Georgia · Built 2016 · 2 Lanes · 1,594 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
000000022351020
Year Built
2016
Length
9.4 m (30.8 ft)
Max Span
9.4 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
1,594
Material
Prestressed Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$2,812,000
Total Project Cost
$4,218,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.