OLD HARRIS ROAD over SILVER COMET TRAIL

4 MILES S. E. OF DALLAS · County 223, Georgia · Built 2010 · 2 Lanes · 1,594 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000022350930
Year Built
2010
Length
46.3 m (151.9 ft)
Max Span
46.3 m
Width
12.9 m (42.3 ft)
Lanes
2
Daily Traffic
1,594
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$594,000
Total Project Cost
$891,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.