EAST MEMORIAL DRIV over GRIFFIN CREEK

1.2 MI NE OF DALLAS · County 223, Georgia · Built 1940 · 2 Lanes · 15,000 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
000000022300230
Year Built
1940
Length
12.2 m (40 ft)
Max Span
2.4 m
Lanes
2
Daily Traffic
15,000
Material
Steel
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$156,000
Total Project Cost
$234,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.