US 278 (WBL) over PUMPKINVINE CREEK

2.2 MI W OF DALLAS · County 223, Georgia · Built 1930 · 2 Lanes · 16,910 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000022300020
Year Built
1930
Reconstructed
1992
Length
75.6 m (248 ft)
Max Span
15.8 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
16,910
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$969,000
Total Project Cost
$1,453,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.