SAXTON-MATTOX RD over GOOSEPOND CREEK

15.9 MI NE OF LEXINGTON · County 221, Georgia · Built 2021 · 1 Lanes · 350 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000022150380
Year Built
2021
Length
27.4 m (89.9 ft)
Max Span
27.4 m
Width
7.3 m (24 ft)
Lanes
1
Daily Traffic
350
Material
Steel
Design
Truss - Thru
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$7,992,000
Total Project Cost
$11,988,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.