SR 77 over BROAD RIVER OVERFLOW

7.5 MI S OF ELBERTON · County 105, Georgia · Built 1948 · 2 Lanes · 1,140 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000010500070
Year Built
1948
Length
74.1 m (243.1 ft)
Max Span
8.2 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
1,140
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$949,000
Total Project Cost
$1,424,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.