SR 77 over GOOSEPOND CREEK

14.4 MI NE OF LEXINGTON · County 221, Georgia · Built 2004 · 2 Lanes · 1,060 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000022150350
Year Built
2004
Length
25.9 m (85 ft)
Max Span
25.9 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
1,060
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$332,000
Total Project Cost
$498,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.