US278 over ALCOVY RIVER OVERFLOW

2.5 MI E OF COVINGTON · County 217, Georgia · Built 2018 · 4 Lanes · 18,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000021750640
Year Built
2018
Length
121.9 m (399.9 ft)
Max Span
12.2 m
Width
27.8 m (91.2 ft)
Lanes
4
Daily Traffic
18,500
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$35,520,000
Total Project Cost
$53,280,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.