COVINGTON BYPASS over WALK / BIKE PATH

1MI S OF COVINGTON · County 217, Georgia · Built 2011 · 2 Lanes · 18,100 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
000000021750670
Year Built
2011
Length
7.3 m (24 ft)
Max Span
7.3 m
Width
19.5 m (64 ft)
Lanes
2
Daily Traffic
18,100
Material
Concrete
Design
Frame (except frame culverts)
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$5,698,000
Total Project Cost
$8,547,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.