I-20 EBL over ALCOVY RIVER TRIB

2.5 MI E OF COVINGTON · County 217, Georgia · Built 1964 · 2 Lanes · 53,200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000021700350
Year Built
1964
Reconstructed
2000
Length
58.5 m (191.9 ft)
Max Span
22.3 m
Width
13.6 m (44.6 ft)
Lanes
2
Daily Traffic
53,200
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$750,000
Total Project Cost
$1,125,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.