CUSTER ROAD over SR 1 SR 520 AND US 27
SE COLUMBUS · County 215, Georgia · Built 2018 · 2 Lanes · 5,462 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
32.405067, -84.913567
This bridge is in worse condition than 41.5% of bridges in County 215. The average bridge in Georgia is 0 years old; this one is 8 years old.
Nearby Bridges
SR 1 RAMP over EMERGENCY TURNAROUND
Built 1989
SR 520 (US 27) over M-8000 CUSTER ROAD
Built 1944
CUSTER ROAD over SR 520- NS RAILROAD
Built 1989
I-185 NB RAMP over SR 520 @ 5.86E
Built 2009
US 27- SR 520 WBL over I-185 (SR 411)
Built 1966
SR 520 (EBL) US 27 over I-185 (SR 411)
Built 1966
I-185 NB RAMP over I-185
Built 2009
SR 520 - US 27 (EB over UPATOI CREEK
Built 1943
SR 520 - US 27 (WB over UPATOI CREEK
Built 1943
OLD CUSSETA ROAD over UPATOI CREEK
Built 2019
Bridge Details
- Structure #
- 000000021550800
- Year Built
- 2018
- Length
- 63.1 m (207 ft)
- Max Span
- 36 m
- Width
- 13.2 m (43.3 ft)
- Lanes
- 2
- Daily Traffic
- 5,462
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $18,352,000
- Total Project Cost
- $27,528,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.