I-185 NB RAMP over I-185

SE COLUMBUS · County 215, Georgia · Built 2009 · 2 Lanes · 4,770 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000021550730
Year Built
2009
Length
79.6 m (261.2 ft)
Max Span
24.7 m
Width
13.8 m (45.3 ft)
Lanes
2
Daily Traffic
4,770
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,020,000
Total Project Cost
$1,530,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.