I-185 NB RAMP over SR 520 @ 5.86E

SE COLUMBUS · County 215, Georgia · Built 2009 · 1 Lanes · 4,770 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000021550690
Year Built
2009
Length
76.5 m (251 ft)
Max Span
22.3 m
Width
13.9 m (45.6 ft)
Lanes
1
Daily Traffic
4,770
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$713,000
Total Project Cost
$1,070,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.