SR 22 RAMP over SR 22

NORTHWEST COLUMBUS · County 215, Georgia · Built 1985 · 1 Lanes · 24,700 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000021501420
Year Built
1985
Length
74.4 m (244.1 ft)
Max Span
37.2 m
Width
10.1 m (33.1 ft)
Lanes
1
Daily Traffic
24,700
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$693,000
Total Project Cost
$1,040,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.