US 80 / SR 22 over SR 219 RIVER ROAD

N COLUMBUS BYPASS-NW COLU · County 215, Georgia · Built 1985 · 3 Lanes · 1,160 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000021501300
Year Built
1985
Length
84.7 m (277.9 ft)
Max Span
34.1 m
Width
17.1 m (56.1 ft)
Lanes
3
Daily Traffic
1,160
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,382,000
Total Project Cost
$2,074,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.