US 80 EBL over SR 22 CONN.

0.6 MI E GA-AL -NW COLUMB · County 215, Georgia · Built 1985 · 2 Lanes · 64,700 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000021501400
Year Built
1985
Length
28.3 m (92.8 ft)
Max Span
28.3 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
64,700
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$363,000
Total Project Cost
$545,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.