SEWELL ROAD over I-85 AT 030.81N

2.7 MI NW OF LONE OAK · County 199, Georgia · Built 1975 · 2 Lanes · 180 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000019900010
Year Built
1975
Length
103 m (337.9 ft)
Max Span
34.4 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
180
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,321,000
Total Project Cost
$1,981,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.