MERIWETHER PARK DR over [email protected]

2 MI W OF LONE OAK · County 199, Georgia · Built 1977 · 2 Lanes · 1,700 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000019900020
Year Built
1977
Length
130.5 m (428.1 ft)
Max Span
43.3 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
1,700
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,672,000
Total Project Cost
$2,508,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.