FORREST ROAD over I-85 @ 033.13N

4 MI W OF LUTHERSVILLE · County 199, Georgia · Built 1973 · 2 Lanes · 610 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000019900640
Year Built
1973
Length
120.1 m (394 ft)
Max Span
36 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
610
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,539,000
Total Project Cost
$2,309,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.