CREEKSIDE DRIVE over SAND CREEK

4.3 MI SW OF GRAY · County 169, Georgia · Built 1992 · 2 Lanes · 470 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000016950400
Year Built
1992
Length
19.2 m (63 ft)
Max Span
19.2 m
Width
8.6 m (28.2 ft)
Lanes
2
Daily Traffic
470
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$246,000
Total Project Cost
$369,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.