US 129 over BONNER CREEK

2.5 MI SW OF GRAY · County 169, Georgia · Built 1957 · 5 Lanes · 17,100 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
000000016900050
Year Built
1957
Reconstructed
1979
Length
9.8 m (32.2 ft)
Max Span
3 m
Lanes
5
Daily Traffic
17,100
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$227,000
Total Project Cost
$341,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.