US 129 (NBL) over SAND CREEK

4.9 MI SW OF GRAY · County 169, Georgia · Built 1979 · 2 Lanes · 16,600 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000016900030
Year Built
1979
Length
36.6 m (120.1 ft)
Max Span
12.2 m
Width
13.3 m (43.6 ft)
Lanes
2
Daily Traffic
16,600
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$469,000
Total Project Cost
$703,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.