US 80 over OHOOPEE RIVER

1.1 MI E OF ADRIAN · County 167, Georgia · Built 2023 · 2 Lanes · 1,870 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000016750310
Year Built
2023
Length
201.2 m (660.1 ft)
Max Span
40.2 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
1,870
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.