SMITH CHAPEL ROAD over BATSON CREEK

2 MI NW OF ADRIAN · County 167, Georgia · Built 2006 · 2 Lanes · 30 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
000000016750250
Year Built
2006
Length
6.4 m (21 ft)
Max Span
1.5 m
Lanes
2
Daily Traffic
30
Material
Steel
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$82,000
Total Project Cost
$123,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.