US 80/ SR 26 over MULEPEN CREEK

3.3 MI NW OF NORRISTOWN · County 107, Georgia · Built 1973 · 2 Lanes · 1,660 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000010700130
Year Built
1973
Length
24.4 m (80.1 ft)
Max Span
12.2 m
Width
11.7 m (38.4 ft)
Lanes
2
Daily Traffic
1,660
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$313,000
Total Project Cost
$469,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.