US 23 NBL over OCMULGEE RIVER

5.8 MI NW OF HAZLEHURST · County 161, Georgia · Built 2005 · 2 Lanes · 6,920 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000016150200
Year Built
2005
Length
373.1 m (1224.1 ft)
Max Span
43.9 m
Width
12.5 m (41 ft)
Lanes
2
Daily Traffic
6,920
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,782,000
Total Project Cost
$7,174,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.