US 23 NBL over OCMULGEE RIVER OVERFLOW

5.6 MI NW OF HAZLEHURST · County 161, Georgia · Built 1967 · 2 Lanes · 6,920 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000016100080
Year Built
1967
Length
158.5 m (520 ft)
Max Span
6.1 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
6,920
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,032,000
Total Project Cost
$3,048,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.