US 23 over OCMULGEE RIVER OVERFLOW

4.6 MI NW OF HAZLEHURST · County 161, Georgia · Built 1984 · 4 Lanes · 6,920 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
000000016100050
Year Built
1984
Length
9.8 m (32.2 ft)
Max Span
3 m
Lanes
4
Daily Traffic
6,920
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$193,000
Total Project Cost
$290,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.