I-985 NBL (US 23) over CR 719- CSX RR

IN GAINESVILLE CITY LIMIT · County 139, Georgia · Built 1968 · 2 Lanes · 64,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000000013900490
Year Built
1968
Length
66.1 m (216.9 ft)
Max Span
25.3 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
64,500
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$848,000
Total Project Cost
$1,272,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.