US 129 (SBL)/ SR 1 over SR 419 (I-985 US 23)

IN SE GAINESVILLE · County 139, Georgia · Built 1968 · 2 Lanes · 2,360 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000013900030
Year Built
1968
Length
79.6 m (261.2 ft)
Max Span
43 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
2,360
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,020,000
Total Project Cost
$1,530,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.