US129 (NBL)/ SR11 over SR 419 (I-985 US 23)
IN SE GAINESVILLE · County 139, Georgia · Built 1968 · 2 Lanes · 43,000 vehicles/day
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
34.285172, -83.806114
This bridge is in worse condition than 93.4% of bridges in County 139. The average bridge in Georgia is 0 years old; this one is 58 years old.
Nearby Bridges
US 129 (SBL)/ SR 1 over SR 419 (I-985 US 23)
Built 1968
ATHENS STREET over SR 419 (I-985 US 23)
Built 1967
SR 53 CONNECTOR over FLAT CREEK
Built 1971
SR 53 CONNECTOR over NOR SOUTHERN RAILROAD
Built 1971
US 129 over NOR SOUTHERN RR- SCL RR.
Built 1969
I-985 SBL (US 23) over SR 53 CONNECTOR
Built 1967
I-985 SBL (US 23) over CR 719- CSX RR
Built 1968
I-985 NBL (US 23) over SR 53 CONNECTOR
Built 1967
I-985 NBL (US 23) over CR 719- CSX RR
Built 1968
DORSEY STREET over FLAT CREEK
Built 1950
Bridge Details
- Structure #
- 000000013900020
- Year Built
- 1968
- Length
- 79.6 m (261.2 ft)
- Max Span
- 43 m
- Width
- 10.5 m (34.4 ft)
- Lanes
- 2
- Daily Traffic
- 43,000
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,020,000
- Total Project Cost
- $1,530,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.