SUGARLOAF PKY (NB over SHOAL CREEK

LAWRENCEVILLE · County 135, Georgia · Built 2010 · 3 Lanes · 74,821 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000013552380
Year Built
2010
Length
210.3 m (690 ft)
Max Span
49.4 m
Width
16.9 m (55.4 ft)
Lanes
3
Daily Traffic
74,821
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$3,431,000
Total Project Cost
$5,147,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.