SUGARLOAF PKY (SBL over SHOAL CREEK

LAWRENCEVILLE · County 135, Georgia · Built 2010 · 2 Lanes · 31,300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000013552370
Year Built
2010
Length
210.3 m (690 ft)
Max Span
49.4 m
Width
13.3 m (43.6 ft)
Lanes
2
Daily Traffic
31,300
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$2,696,000
Total Project Cost
$4,044,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.