NEW HOPE ROAD over SUGARLOAF PKY
LAWRENCEVILLE · County 135, Georgia · Built 2010 · 6 Lanes · 7,906 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.932097, -83.940767
This bridge is in worse condition than 38.1% of bridges in County 135. The average bridge in Georgia is 0 years old; this one is 16 years old.
Nearby Bridges
HIRAM DAVIS ROAD over SUGARLOAF PKY
Built 2010
SUGARLOAF PKY (SBL over CHANDLER ROAD
Built 2010
SUGARLOAF PKY (NBL over CHANDLER ROAD
Built 2010
SIMONTON ROAD over SHOAL CREEK
Built 1989
CHANDLER ROAD over ALCOVY RIVER TRIB
Built 1993
HIRAM DAVIS ROAD over SHOAL CREEK
Built 1994
SUGARLOAF PKY (SBL over SHOAL CREEK
Built 2010
SUGARLOAF PKY (NB over SHOAL CREEK
Built 2010
RAMP TO NB SUGARLO over SHOAL CREEK
Built 2010
PAPER MILL ROAD over SHOAL CREEK
Built 1989
Bridge Details
- Structure #
- 000000013552350
- Year Built
- 2010
- Length
- 49.4 m (162.1 ft)
- Max Span
- 24.7 m
- Width
- 41.9 m (137.5 ft)
- Lanes
- 6
- Daily Traffic
- 7,906
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,323,000
- Total Project Cost
- $1,985,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.