85 NBCD (40310N) over 85 NB RAMP TO OLD PEACH

2 MI EAST OF DULUTH · County 135, Georgia · Built 2008 · 2 Lanes · 6,821 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
000000013552230
Year Built
2008
Length
39.9 m (130.9 ft)
Max Span
39.9 m
Width
19.9 m (65.3 ft)
Lanes
2
Daily Traffic
6,821
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$512,000
Total Project Cost
$768,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.