85 NBCD (40310N) over 85 NB RAMP TO OLD PEACH
2 MI EAST OF DULUTH · County 135, Georgia · Built 2008 · 2 Lanes · 6,821 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
33.998328, -84.075669
This bridge is in worse condition than 38.1% of bridges in County 135. The average bridge in Georgia is 0 years old; this one is 18 years old.
Nearby Bridges
OLD PEACHTREE RD R over SBCD 85
Built 2008
OLD PEACHTREE ROAD over I-85 (SR 403)
Built 2003
I-85 NB SB AND CD over SUGARLOAF PARKWAY
Built 1999
I-85R SB TO SR 120 over 403 CONNECTOR.
Built 2001
I-85 RAMP over 403 CONNECTOR.
Built 2001
DULUTH HIGHWAY over I-85 2 RAMPS
Built 2001
NORTHBROOK PARKWAY over MILL CREEK
Built 2011
SATELLITE BLVD. over FORK CREEK
Built 1983
SUWANEE CRK ROAD over BENNETT CREEK
Built 1958
SUGARLOAF PARKWAY over FORK CREEK TRIB
Built 1999
Bridge Details
- Structure #
- 000000013552230
- Year Built
- 2008
- Length
- 39.9 m (130.9 ft)
- Max Span
- 39.9 m
- Width
- 19.9 m (65.3 ft)
- Lanes
- 2
- Daily Traffic
- 6,821
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $512,000
- Total Project Cost
- $768,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.