I-85R SB TO SR 120 over 403 CONNECTOR.
2.5 MI E OF DULUTH · County 135, Georgia · Built 2001 · 2 Lanes · 12,600 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
33.982006, -84.087783
This bridge is in worse condition than 38.1% of bridges in County 135. The average bridge in Georgia is 0 years old; this one is 25 years old.
Nearby Bridges
I-85 RAMP over 403 CONNECTOR.
Built 2001
DULUTH HIGHWAY over I-85 2 RAMPS
Built 2001
I-85 NB SB AND CD over SUGARLOAF PARKWAY
Built 1999
SATELLITE BLVD. over FORK CREEK
Built 1983
I-85 NB & SB NBCD over FORK CREEK
Built 1990
BOGGS ROAD over I-85
Built 1999
SR 120 over FORK CREEK
Built 1960
DULUTH HWY (SR120) over SWEETWATER CREEK
Built 2021
BRECKINRIDGE BLVD over SR 316
Built 2001
BOGGS ROAD over SR 316 RAMPS 316 EB WB
Built 1999
Bridge Details
- Structure #
- 000000013551950
- Year Built
- 2001
- Length
- 76.2 m (250 ft)
- Max Span
- 26.8 m
- Width
- 14.3 m (46.9 ft)
- Lanes
- 2
- Daily Traffic
- 12,600
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $977,000
- Total Project Cost
- $1,465,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.