DULUTH HWY (SR120) over SWEETWATER CREEK
1.5 MI E OF DULUTH · County 135, Georgia · Built 2021 · 2 Lanes · 15,400 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
33.978692, -84.109497
This bridge is in worse condition than 38.1% of bridges in County 135. The average bridge in Georgia is 0 years old; this one is 5 years old.
Nearby Bridges
SR 120 over FORK CREEK
Built 1960
SATELLITE BLVD over SINGLETON CREEK
Built 1983
SATELLITE BLVD. over FORK CREEK
Built 1983
SR 316 RAMP over I-85 I-85 NBCD & SBCD
Built 2007
85 SBCD OVER SWEET over SWEETWATER CREEK
Built 2007
316 WB TO 85 SOUTH over SWEETWATER CREEK
Built 2007
I-85 SBL over SWEETWATER CREEK
Built 1958
BOGGS ROAD over I-85
Built 1999
316 TO 85 SOUTH over I-85 NBCD
Built 2007
I-85 NB & SB NBCD over FORK CREEK
Built 1990
Bridge Details
- Structure #
- 000000013552830
- Year Built
- 2021
- Length
- 59.4 m (194.9 ft)
- Max Span
- 19.8 m
- Width
- 19.2 m (63 ft)
- Lanes
- 2
- Daily Traffic
- 15,400
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $17,316,000
- Total Project Cost
- $25,974,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.