I-85 NB SB AND CD over SUGARLOAF PARKWAY
3 MI N OF DULUTH · County 135, Georgia · Built 1999 · 16 Lanes · 172,000 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
33.987511, -84.084253
This bridge is in worse condition than 38.1% of bridges in County 135. The average bridge in Georgia is 0 years old; this one is 27 years old.
Nearby Bridges
I-85R SB TO SR 120 over 403 CONNECTOR.
Built 2001
I-85 RAMP over 403 CONNECTOR.
Built 2001
DULUTH HIGHWAY over I-85 2 RAMPS
Built 2001
85 NBCD (40310N) over 85 NB RAMP TO OLD PEACH
Built 2008
OLD PEACHTREE RD R over SBCD 85
Built 2008
OLD PEACHTREE ROAD over I-85 (SR 403)
Built 2003
SATELLITE BLVD. over FORK CREEK
Built 1983
I-85 NB & SB NBCD over FORK CREEK
Built 1990
BOGGS ROAD over I-85
Built 1999
SR 120 over FORK CREEK
Built 1960
Bridge Details
- Structure #
- 000000013551730
- Year Built
- 1999
- Length
- 49.4 m (162.1 ft)
- Max Span
- 49.4 m
- Width
- 113.2 m (371.4 ft)
- Lanes
- 16
- Daily Traffic
- 172,000
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,050,000
- Total Project Cost
- $4,575,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.