OLD NORCROSS ROAD over I-85 NB + SB NBCD SBCD
3.3 MI SE OF DULUTH · County 135, Georgia · Built 2007 · 4 Lanes · 18,106 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.959561, -84.114389
This bridge is in worse condition than 38.1% of bridges in County 135. The average bridge in Georgia is 0 years old; this one is 19 years old.
Nearby Bridges
85 SBCD OVER SWEET over SWEETWATER CREEK
Built 2007
316 WB TO 85 SOUTH over SWEETWATER CREEK
Built 2007
316 HOV EB over SWEETWATER CREEK
Built 2008
I-85 NBL over SWEETWATER CREEK
Built 1958
I-85 NBCD over SWEETWATER CREEK
Built 2008
I-85 SBL over SWEETWATER CREEK
Built 1958
SR 316 RAMP over I-85 I-85 NBCD & SBCD
Built 2007
SATELLITE BLVD over SINGLETON CREEK
Built 1983
316 TO 85 SOUTH over I-85 NBCD
Built 2007
SR 316 EB over I-85 NBCD
Built 2008
Bridge Details
- Structure #
- 000000013552030
- Year Built
- 2007
- Length
- 138.4 m (454.1 ft)
- Max Span
- 44.8 m
- Width
- 26.3 m (86.3 ft)
- Lanes
- 4
- Daily Traffic
- 18,106
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,741,000
- Total Project Cost
- $4,112,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.