316 HOV EB over SWEETWATER CREEK
3.5 MI SE DULUTH · County 135, Georgia · Built 2008 · 1 Lanes · 2,930 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
33.963189, -84.104972
This bridge is in worse condition than 38.1% of bridges in County 135. The average bridge in Georgia is 0 years old; this one is 18 years old.
Nearby Bridges
I-85 NBL over SWEETWATER CREEK
Built 1958
316 WB TO 85 SOUTH over SWEETWATER CREEK
Built 2007
85 SBCD OVER SWEET over SWEETWATER CREEK
Built 2007
I-85 NBCD over SWEETWATER CREEK
Built 2008
I-85 SBL over SWEETWATER CREEK
Built 1958
SR 316 RAMP over I-85 I-85 NBCD & SBCD
Built 2007
SATELLITE BLVD over SINGLETON CREEK
Built 1983
316 TO 85 SOUTH over I-85 NBCD
Built 2007
316 E/B & W/B HOV over I-85 NB
Built 2008
SR 316 EB over I-85 NBCD
Built 2008
Bridge Details
- Structure #
- 000000013552180
- Year Built
- 2008
- Length
- 56.4 m (185 ft)
- Max Span
- 22.9 m
- Width
- 10.1 m (33.1 ft)
- Lanes
- 1
- Daily Traffic
- 2,930
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $526,000
- Total Project Cost
- $789,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.