I-85 NBL over SWEETWATER CREEK

3.5 MI SE OF DULUTH · County 135, Georgia · Built 1958 · 7 Lanes · 131,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000013500520
Year Built
1958
Reconstructed
2008
Length
46.3 m (151.9 ft)
Max Span
17.1 m
Width
40.6 m (133.2 ft)
Lanes
7
Daily Traffic
131,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,404,000
Total Project Cost
$2,106,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.