PEACHTREE PWY NBL over M-9431 SBL PTREE IND BD

1.3 MI N OF NORCROSS · County 135, Georgia · Built 1969 · 2 Lanes · 46,200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000013500330
Year Built
1969
Length
60.4 m (198.2 ft)
Max Span
26.8 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
46,200
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$774,000
Total Project Cost
$1,160,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.