JONES MILL ROAD over SR 141- 2 SR 141 RAMPS

2 MI W OF NORCROSS · County 135, Georgia · Built 1988 · 6 Lanes · 17,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000013501090
Year Built
1988
Length
80.5 m (264.1 ft)
Max Span
20.4 m
Width
27.3 m (89.6 ft)
Lanes
6
Daily Traffic
17,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,157,000
Total Project Cost
$3,235,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.