BETHANY ROAD over S. FORK OGEECHEE RIVER

2.6 MI NE OF SILOAM · County 133, Georgia · Built 1985 · 2 Lanes · 230 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
000000013350390
Year Built
1985
Length
9.1 m (29.9 ft)
Max Span
2.7 m
Lanes
2
Daily Traffic
230
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$117,000
Total Project Cost
$176,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.